Featured post

Abandoned and Disused at Barry Scrapyard to the Kent and East Sussex Railway 4253

A Old Abandoned Rusty Train In Barry Scrapyard.  now plan are at thought to rebuild the loco to support the future extension of KES...

Monday 13 March 2017

Kent and East Sussex Railway and Rother Valley Railway Extension to Udiam Farm from Bodiam

The Rother Valley Railway, a preservation group set up in 1991




had by March 2009 laid track from Bodiam to within 200 yards (180 m) of the site of Junction Road Halt at a cost of £200,000
.
Track was relaid through the site of the halt in June 2010.
 On 18 March 2011, a VIP dining special was the first passenger train to traverse the rebuilt line.
The following weekend of 19/20 March saw Kent and East Sussex Railway services run as far as Junction Road

Popular Posts